Embuild

Ayudas a la rehabilitación energética en Bulgaria

Descubre todas las subvenciones, préstamos y deducciones fiscales disponibles en Bulgaria para rehabilitar tu vivienda.

4 dispositivosMinistère du développement régional et des travaux publics (МРРБ)Reference updated on 20 de mayo de 2026

Calculate your grants in a few clicks

The calculator applies all Bulgaria schemes below to your personal situation.

Open the calculator

Sustainable Energy Renovation Support — Stage I

Cerrado
МРРБ / Banque bulgare de développementSubvención

Sustituido por Second National Renovation Programme (announced June 2026)

Checked on 29 August 2026 with the Ministry of Regional Development and eufunds.bg. Procedure BG-RRP-4.023, financed by the national recovery and resilience plan under the “Green Bulgaria” pillar, has completed its first stage. The earlier national programme, endowed with 2 billion leva, had brought 1,968 buildings and 131,729 dwellings back into service by 31 December 2024. A new procedure, referenced BG16FFPR003-1.001, carries more than €375 million of non-repayable assistance with applications open until 1 July 2026 at 5 p.m. The exact mapping between that procedure and the second national programme remains to be confirmed at source.

Obras elegibles

Rehabilitación integralAislamiento exteriorAislamiento cubiertaAislamiento sueloCambio ventanasCambio puertasVentilación doble flujoBomba de calor aire-agua+2

Importes

  • 100% · Applications submitted until March 2023: 100%
  • 80% · Applications April-December 2023: 80% (20% self-financing initially required)
Conditions: Co-owner associations of multi-family buildings designed before 26/04/1999, ≥ 3 floors, ≥ 6 dwellings. Target: energy class B + ≥ 30% primary energy savings. Investment completion deadline: 30/06/2026 (extended to 31/12/2029 for buildings transferred to BDB).

Sustainable Energy Renovation Support — Stage II

Activo
МРРБ / Banque bulgare de développementSubvención

Obras elegibles

Rehabilitación integralAislamiento exteriorAislamiento cubiertaAislamiento sueloCambio ventanasCambio puertasVentilación doble flujoBomba de calor aire-agua+2

Importes

  • 100% · 100% grant (after removal of 20% co-financing)
Conditions: Condominiums (associations under floor ownership law); ≥ 4 units, ≥ 60% residential floor area. Target: class B, ≥ 30% primary energy savings, energy poverty reduction. 282 buildings approved, budget ≈ €144M incl. VAT.
2026 changes: Removal of 20% co-financing — 100% free renovation for condominiums. Operational transfer to BDB for 454 buildings beyond the 30/06/2026 deadline.

Second National Renovation Programme (announced June 2026)

Próximo
МРРБSubvención

Obras elegibles

Rehabilitación integralAislamiento exteriorAislamiento cubiertaCambio ventanasBomba de calor aire-aguaVentilación doble flujoOtro

Importes

  • 100% · Announced 100% grant; budget > €1.248B, ≈ 2,000 buildings targeted (≈ 500/yr)
Conditions: Buildings designed before 26/04/1999, ≥ 3 floors, ≥ 6 dwellings; buildings not previously applying and reserve lists. 2026 new feature: coverage of obsolete elevator replacement/renovation.

Residential PV + solar collectors (RRF)

Cerrado
Ministère de l'énergieSubvención

Obras elegibles

FotovoltaicaSolar térmicaAlmacenamiento batería

Importes

  • 100% · Solar thermal collectors: 100%
  • 70% · cap 7660 € · PV up to 10 kWp + batteries: 70%, ceiling ≈ €7,660/household
Conditions: Bulgarian residents occupying the building; current use of inefficient solid fuel heating. Programme declared closed — no second phase. Of 10,000 target households, ≈ 1,500 applications approved in phase 1 for ≈ €20M.

Track grant changes in Bulgaria

Get rate changes, new schemes and budget exhaustion alerts for Bulgaria by email. One per month max, never spam.