Embuild

Ayudas a la rehabilitación energética en Bulgaria

Descubre todas las subvenciones, préstamos y deducciones fiscales disponibles en Bulgaria para rehabilitar tu vivienda.

4 dispositivosMinistère du développement régional et des travaux publics (МРРБ)Reference updated on 20 de mayo de 2026

Calculate your grants in a few clicks

The calculator applies all Bulgaria schemes below to your personal situation.

Open the calculator

Sustainable Energy Renovation Support — Stage I

Cerrado
МРРБ / Banque bulgare de développementSubvención

Obras elegibles

Rehabilitación integralAislamiento exteriorAislamiento cubiertaAislamiento sueloCambio ventanasCambio puertasVentilación doble flujoBomba de calor aire-agua+2

Importes

  • 100% · Applications submitted until March 2023: 100%
  • 80% · Applications April-December 2023: 80% (20% self-financing initially required)
Conditions: Co-owner associations of multi-family buildings designed before 26/04/1999, ≥ 3 floors, ≥ 6 dwellings. Target: energy class B + ≥ 30% primary energy savings. Investment completion deadline: 30/06/2026 (extended to 31/12/2029 for buildings transferred to BDB).

Sustainable Energy Renovation Support — Stage II

Activo
МРРБ / Banque bulgare de développementSubvención

Obras elegibles

Rehabilitación integralAislamiento exteriorAislamiento cubiertaAislamiento sueloCambio ventanasCambio puertasVentilación doble flujoBomba de calor aire-agua+2

Importes

  • 100% · 100% grant (after removal of 20% co-financing)
Conditions: Condominiums (associations under floor ownership law); ≥ 4 units, ≥ 60% residential floor area. Target: class B, ≥ 30% primary energy savings, energy poverty reduction. 282 buildings approved, budget ≈ €144M incl. VAT.
2026 changes: Removal of 20% co-financing — 100% free renovation for condominiums. Operational transfer to BDB for 454 buildings beyond the 30/06/2026 deadline.

Second National Renovation Programme (announced June 2026)

Próximo
МРРБSubvención

Obras elegibles

Rehabilitación integralAislamiento exteriorAislamiento cubiertaCambio ventanasBomba de calor aire-aguaVentilación doble flujoOtro

Importes

  • 100% · Announced 100% grant; budget > €1.248B, ≈ 2,000 buildings targeted (≈ 500/yr)
Conditions: Buildings designed before 26/04/1999, ≥ 3 floors, ≥ 6 dwellings; buildings not previously applying and reserve lists. 2026 new feature: coverage of obsolete elevator replacement/renovation.

Residential PV + solar collectors (RRF)

Cerrado
Ministère de l'énergieSubvención

Obras elegibles

FotovoltaicaSolar térmicaAlmacenamiento batería

Importes

  • 100% · Solar thermal collectors: 100%
  • 70% · cap 7660 € · PV up to 10 kWp + batteries: 70%, ceiling ≈ €7,660/household
Conditions: Bulgarian residents occupying the building; current use of inefficient solid fuel heating. Programme declared closed — no second phase. Of 10,000 target households, ≈ 1,500 applications approved in phase 1 for ≈ €20M.

Track grant changes in Bulgaria

Get rate changes, new schemes and budget exhaustion alerts for Bulgaria by email. One per month max, never spam.