Embuild

Apoios à reabilitação energética em Bulgária

Descubra todos os subsídios, empréstimos e créditos fiscais disponíveis em Bulgária para reabilitar a sua habitação.

4 dispositivosMinistère du développement régional et des travaux publics (МРРБ)Reference updated on 20 de maio de 2026

Calculate your grants in a few clicks

The calculator applies all Bulgária schemes below to your personal situation.

Open the calculator

Sustainable Energy Renovation Support — Stage I

Fechado
МРРБ / Banque bulgare de développementSubsídio

Substituído por Second National Renovation Programme (announced June 2026)

Checked on 29 August 2026 with the Ministry of Regional Development and eufunds.bg. Procedure BG-RRP-4.023, financed by the national recovery and resilience plan under the “Green Bulgaria” pillar, has completed its first stage. The earlier national programme, endowed with 2 billion leva, had brought 1,968 buildings and 131,729 dwellings back into service by 31 December 2024. A new procedure, referenced BG16FFPR003-1.001, carries more than €375 million of non-repayable assistance with applications open until 1 July 2026 at 5 p.m. The exact mapping between that procedure and the second national programme remains to be confirmed at source.

Obras elegíveis

Renovação integralIsolamento exteriorIsolamento da coberturaIsolamento pavimentoSubstituição janelasSubstituição portasVentilação duplaBomba de calor ar-água+2

Montantes

  • 100% · Applications submitted until March 2023: 100%
  • 80% · Applications April-December 2023: 80% (20% self-financing initially required)
Conditions: Co-owner associations of multi-family buildings designed before 26/04/1999, ≥ 3 floors, ≥ 6 dwellings. Target: energy class B + ≥ 30% primary energy savings. Investment completion deadline: 30/06/2026 (extended to 31/12/2029 for buildings transferred to BDB).

Sustainable Energy Renovation Support — Stage II

Ativo
МРРБ / Banque bulgare de développementSubsídio

Obras elegíveis

Renovação integralIsolamento exteriorIsolamento da coberturaIsolamento pavimentoSubstituição janelasSubstituição portasVentilação duplaBomba de calor ar-água+2

Montantes

  • 100% · 100% grant (after removal of 20% co-financing)
Conditions: Condominiums (associations under floor ownership law); ≥ 4 units, ≥ 60% residential floor area. Target: class B, ≥ 30% primary energy savings, energy poverty reduction. 282 buildings approved, budget ≈ €144M incl. VAT.
2026 changes: Removal of 20% co-financing — 100% free renovation for condominiums. Operational transfer to BDB for 454 buildings beyond the 30/06/2026 deadline.

Second National Renovation Programme (announced June 2026)

Em breve
МРРБSubsídio

Obras elegíveis

Renovação integralIsolamento exteriorIsolamento da coberturaSubstituição janelasBomba de calor ar-águaVentilação duplaOutro

Montantes

  • 100% · Announced 100% grant; budget > €1.248B, ≈ 2,000 buildings targeted (≈ 500/yr)
Conditions: Buildings designed before 26/04/1999, ≥ 3 floors, ≥ 6 dwellings; buildings not previously applying and reserve lists. 2026 new feature: coverage of obsolete elevator replacement/renovation.

Residential PV + solar collectors (RRF)

Fechado
Ministère de l'énergieSubsídio

Obras elegíveis

FotovoltaicoSolar térmicoArmazenamento bateria

Montantes

  • 100% · Solar thermal collectors: 100%
  • 70% · cap € 7.660 · PV up to 10 kWp + batteries: 70%, ceiling ≈ €7,660/household
Conditions: Bulgarian residents occupying the building; current use of inefficient solid fuel heating. Programme declared closed — no second phase. Of 10,000 target households, ≈ 1,500 applications approved in phase 1 for ≈ €20M.

Track grant changes in Bulgária

Get rate changes, new schemes and budget exhaustion alerts for Bulgária by email. One per month max, never spam.