Apoios à reabilitação energética em Bulgária
Descubra todos os subsídios, empréstimos e créditos fiscais disponíveis em Bulgária para reabilitar a sua habitação.
4 dispositivosMinistère du développement régional et des travaux publics (МРРБ)Reference updated on 20 de maio de 2026
Calculate your grants in a few clicks
The calculator applies all Bulgária schemes below to your personal situation.
Sustainable Energy Renovation Support — Stage I
FechadoМРРБ / Banque bulgare de développementSubsídio
Obras elegíveis
Renovação integralIsolamento exteriorIsolamento da coberturaIsolamento pavimentoSubstituição janelasSubstituição portasVentilação duplaBomba de calor ar-água+2
Montantes
- 100% · Applications submitted until March 2023: 100%
- 80% · Applications April-December 2023: 80% (20% self-financing initially required)
Conditions: Co-owner associations of multi-family buildings designed before 26/04/1999, ≥ 3 floors, ≥ 6 dwellings. Target: energy class B + ≥ 30% primary energy savings. Investment completion deadline: 30/06/2026 (extended to 31/12/2029 for buildings transferred to BDB).
Sustainable Energy Renovation Support — Stage II
AtivoМРРБ / Banque bulgare de développementSubsídio
Obras elegíveis
Renovação integralIsolamento exteriorIsolamento da coberturaIsolamento pavimentoSubstituição janelasSubstituição portasVentilação duplaBomba de calor ar-água+2
Montantes
- 100% · 100% grant (after removal of 20% co-financing)
Conditions: Condominiums (associations under floor ownership law); ≥ 4 units, ≥ 60% residential floor area. Target: class B, ≥ 30% primary energy savings, energy poverty reduction. 282 buildings approved, budget ≈ €144M incl. VAT.
2026 changes: Removal of 20% co-financing — 100% free renovation for condominiums. Operational transfer to BDB for 454 buildings beyond the 30/06/2026 deadline.
Second National Renovation Programme (announced June 2026)
Em breveМРРБSubsídio
Obras elegíveis
Renovação integralIsolamento exteriorIsolamento da coberturaSubstituição janelasBomba de calor ar-águaVentilação duplaOutro
Montantes
- 100% · Announced 100% grant; budget > €1.248B, ≈ 2,000 buildings targeted (≈ 500/yr)
Conditions: Buildings designed before 26/04/1999, ≥ 3 floors, ≥ 6 dwellings; buildings not previously applying and reserve lists. 2026 new feature: coverage of obsolete elevator replacement/renovation.
Residential PV + solar collectors (RRF)
FechadoMinistère de l'énergieSubsídio
Obras elegíveis
FotovoltaicoSolar térmicoArmazenamento bateria
Montantes
- 100% · Solar thermal collectors: 100%
- 70% · cap € 7.660 · PV up to 10 kWp + batteries: 70%, ceiling ≈ €7,660/household
Conditions: Bulgarian residents occupying the building; current use of inefficient solid fuel heating. Programme declared closed — no second phase. Of 10,000 target households, ≈ 1,500 applications approved in phase 1 for ≈ €20M.
Track grant changes in Bulgária
Get rate changes, new schemes and budget exhaustion alerts for Bulgária by email. One per month max, never spam.